|
View specifications
Larger capacity tanks for greater W. P. are available if required. The
minimum size of any boiler blow-off tank shall be equal to or greater
than the water capacity of the boiler as registered by 3" on the boiler
gauge, or for a blow down operation of not less than one minute.
|